4th straight win!The Ceres 1 rocket successfully launched five Gaofen-03D satellites to help the Jilin-1 constellation network
Three straight wins! Galactic Energy took the lead in entering a new stage of large-scale launch of private rockets
Galactic Energy successfully completed the reliability growth test of the orbital attitude control power system of Ceres I rocket
Galactic Energy completed the single ground thermal test of the 300N and 50N engines of the Palladium I auxiliary power system
Galactic Energy successfully completed a series of static and separation tests on the large-diameter fairing of Ceres-1 carrier rocket
The first full system test of Galactic Energy 50-ton liquid oxygen/kerosene engine was a complete success
Post-doctoral research station in Beijing economic development zone was approved and set up by Galactic Energy Space Company.
Galactic Energy Space Company and Huanhui Technology Company sign a strategic cooperation agreement: Rocket development will fully open the full life cycle of 3D product data in-depth application process.
One rocket, five satellites. With the first consecutive successful launch of a private rocket, Galactic Energy Space Company has achieved a new breakthrough in commercial spaceflight
One year anniversary of successful orbiting! Ceres-1 completes a series of reliability tests, and the rocket is ready for a multi-satellite launch
Welkin Liquid Engine key component: The Pin Type Injector Thrust Chamber test parts has been assembled and delivered